Run the cable back.
How to install gutter heaters.
Project step by step 20 cutting the gutter.
Begin by installing a slip joint splice on each end of an inside corner fitting.
Use a square and pencil to mark the gutter length and cut to the line.
Clip the starting point of the cable to a.
Route the cable from the electrical outlet to the starting point on the roof.
This product is also not meant for clearing the roof of ice or snow but merely for creating a clear pathway for already melted snow and ice to drain to the ground.
Installing gutter heat tape is meant for the prevention of the ice dams not for getting rid of them once already formed.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Then trim the first section of the gutter to length with tin snips.
Here are the basic steps for installing new heat cable along a roof eave and gutter.
It s much easier to join sections on the ground than to work from the top of a ladder.