This is how to install epdm roofing correctly.
How to install termination bar with epdm roofing.
Do not remove the protective paper.
Prior to installation of the termination bar pull back the topside of the membrane flashing 20 mm and apply a bead of water block between the membrane and the wall.
Ensure that the rubber membrane extends a minimum of 25mm on to the.
With a pencil or chalk line mark the desired rubber perimeter on the wall and roof edges.
Do not bend the bar around the corners.
Position termination bar on.
The bar is 25mm x 3m and has pre punched holes every 150mm on center.
For more information please visit http.
Full installation of classicbond epdm roof with sure edge trims.
A termination bar must be cut at inside and outside corners.
Start with the edge facing the wall and work towards the roof s edge.
Installing z bar flashing on tpo termination bar.
Fold back the rubber membrane over the surface to be joined to.
Apply termination tape to the wall just below the line.
How to install a termination bar video and installation guide fold back epdm and apply water cut off mastic.
Pull the rubber from the shipping box and drag it across the roof.
Install the termination bar with an acceptable hammer plug system at 200 mm o c.
Metal edge termination epdm detail.
The termination bar is an extruded aluminum bar that s designed for securing and sealing compression type flashing terminations when the water cut off mastic is inserted behind the epdm membrane and lap sealant is applied along the top of the termination bar.