The series highlights our popular duration shingles along with up to 7 other duration styles depending on where you live that feature unique performance characteristics.
How to instol black roof shingles.
Cut 11 off the first shingle of the third course and save this for later.
Adhere the shingles adjacent to the flange with roofing tar.
Installation of underlayment application of vall.
List of the pros of black roof shingles.
Shown are iko dynasty performance shingles in sedona a very dramatic color blend.
Shingle colors for weathered wood or log houses include brown green black grey.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Shingle colors for white houses include brown grey black green blue white.
Install new flashing metal.
Cut the shingles to fit around the flange s dome.
Black roof shingles do an excellent job of absorbing the heat from the sun each day.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Adhere the joint where the cut edges of the shingles meet the dome.
Leave the bottom 55 8 tab portion of the first course shingle exposed.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Using your staple gun secure the felt to the roof.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Overlap each row at least 3 to 4 inches.
How to apply iko roof shingles in a correct manner.
This tutorial shows the roofer the different steps.
Duration series shingles are unrivaled by any other architectural shingles because they feature our patented surenail technology a technological breakthrough in shingle design.
Apply the previously removed 11 long piece over and above the third course shingle.
Consider a shingle with a high definition profile to mimic the look of natural wood shakes.
Install the 273 4 long piece over and above the second course shingle.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Lay the lower edge of the flange over the top of the lower shingles and the upper edge is positioned underneath the.
See below for a shopping list tools and steps subscr.