8 inside closure install along the length of the transition trim about 2 above the bend.
How to lay apro panel roofing.
Most panels come up to 32 feet 9 8 m in length.
At this point chalk a line from ridge to eave.
Double embossed 26 gauge galvalume coated steel shingles.
Pro panel ii install guide.
6 transition trim place trim over outside closure.
The application and detail drawings in this manual are strictly for illustration purposes and may not be appli.
Pre drill holes on the ridges.
If yours do not then you will need to drill holes.
Measure the roof with a.
Take measurements from the roof peak to the eave for custom cut premium pro snap panels.
Measure one panel width in from the roof edge.
The roof panels will not withstand the weight of a person standing at the edge of the panel.
Place the first screw.
Panel roof cost non discounted retail pricing for.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Allow for a minimum of 18.
Always begin working at the point with the longest peak to eave distance.
Panel roofing installation labor basic basic labor to install panel roofing with favorable site.
50 yr limited warranty.
The national average cost to install panel roofing is 6 13 per square foot with a range between 5 05 to 7 21.
Quantity includes typical waste overage material for repair and local delivery.
How to install premium pro snap roofing step 1.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Some panels have pre drilled holes.
Installing corrugated roofing 1.
Fasten using panel wood screws.
Contact building regulators to determine the requirements for.
Use a scaffold for easy access to the roof.
Add the metal panels.
Take care the first piece is aligned precisely perpendicular square to the edge.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
9 roofing panel install with lower edge 1 above the transition bend.
Place the leading edge of the first panel along this line.
10 panel wood screw space according to the recommended fastening pattern and local codes.
A typical 2000 square foot project costs 22 382.
Install the roofing screws vertically along each rib in the panel.