On wide boards 12 or wider put 2 nails about 2 to 3 inches apart in the middle.
How to lay batten boards for barn roof.
Install 10 x 1 vertical siding boards from top of water board drip flashing to top of wall spaced 1 apart.
This is what people who nail green board and battens up say.
His plans call for 9 1 2 in.
Jam them up tight and put the batten on so that the nail hits between the two boards.
Install 3 x 1 border trim at top of siding.
Types of roof batten systems.
The battens are vertical boards on the backside.
Install 10 x 1 water table skirt board at base of wall.
Install drip flashing on top edge of skirt board.
I also didn t need the door to be water tight since there s a roof over the area.
Barn doors were typically made with leftover wood from the barn build and like i said before built to withstand weather movement.
While roof battens are most commonly made of metal or wood they can be made of other materials like plastic or composite there are several different types of batten some combine two materials to get the needed affect.
Install board and batten siding and trim.
Use a 4 foot carpenter s level to keep the boards vertical.
Bargeboards and in some cases gable end brickwork are prone to deviation in their length just like the fascia boards at the eaves and this can transfer itself to the verge detail when installing the undercloak.
Boards want to cup one way so put the hump out bark side in and put one nail in the center.
Roof undercloak installation overview.
When set in mortar a cut batten end should be treated or the batten turned so that the treated end is in the mortar.
Battens which he says he ll finish with a high quality stain.
The boards will typically try to cup as they dry.
There are many ways to nail board and batten siding.
I went with 1x12s that were common pine boards since they were fairly cheap.
Writing to fine homebuilding s breaktime forum wenws is looking for some advice on the best way to finish the board and batten siding for his new house.
Here are four methods to do the job right.
If you pre drill the boards use one as a pattern and drill the rest of them on a flat horizontal surface.
For example elevated battens are standard wood battens that have a block of plastic in some cases wood attached to the underside to elevate.