If the soffit on your house wraps around a corner you will need to.
How to properly nail vinyl siding.
Renail right next to the old nail leaving at least a 1 16 in.
When installing in freezing weather below 40.
Gap between the nailhead and the vinyl to allow easy movement.
Nail j channel pieces under the fascia.
Remove all protrusions such as gutters down spouts and.
Ideally nails should go in about 1 32 of an inch from each panel s edge although you should read the manufacturer s guidelines for the proper measurements.
Re siding nail down loose boards of existing siding and replace any rotten ones fig.
Do not install vinyl siding over.
Siding must be cut in lengths to provide for expansion.
Siding the soffit and fascia area 1.
Keep your nails straight and give your vinyl siding a little room to breathe and you should be covered for the next 20 to 40 years all for the price of a little elbow grease.
Scrape off loose caulk and re caulk around windows doors and other areas to protect from moisture penetration.
Allow a 1 4 in.
Have the necessary tools for this diy project lined up before you start you ll save time and frustration.
Allow approximately 1 32 0 8mm clearance about the thickness of a dime between the fastener head and the siding panel.
Understand how to deal with wrap around soffit.
Measure and cut the soffit.
Vinyl siding must be nailed so expansion and contraction are not restricted.
Install lengths of j channel along the inner edge of the fascia.
Required tools for this project.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.