Place the second step flashing piece over the end shingle in the first course by positioning it 143 mm 5 5 8 above the bottom edge of the exposed asphalt shingle.
How to shingle apex of roof.
However the job will go much faster and easier if you can rent or borrow some of the power specialty tools.
Although ceramic tile roofs are expensive they can have a life span of over 100 years.
Secure the horizontal flange to the roof.
Shingles of lower quality can be damaged and cause a leak.
Set the first shingle of the second row back a half tab 6 inches 17 centimeters from the edge of first shingle on the first row and so that the bottom of its tabs just touches the tops of the cutout slots on the shingle below.
Hook knife method after each shingle line has been laid one shingle will overhang the rake edge.
At the very peak you ll make four cuts through a shingle forming a right angle x but leave solid shingle to cover where the four hips join.
Make sure that the tab of the shingle in the second course will cover it completely.
The flatter the roof the greater the chance that rain can t flow away from your roof and will remain there.
Roof pitch is the measurement of a roof s vertical rise divided by its horizontal run.
Building an apex roof.
This 1 2 tab has to be cut off where it hangs off the left edge of the gable roof.
A couple of weeks ago we published a two part series showing how a local roofing contractor shingled a roof with architectural shingles.
In this case using high quality shingles is even more important.
Flat shovel or pitch fork pry bar tin snips.
When building an apex roof there are many things you should take into account.
It is often compared to slope but is not exactly the same.
Lay the second row of shingles.
When installing a new asphalt shingle roof you really do not need any specialty tools to tear off and re roof your home.
This project guide is a combination of those two articles and it covers replacing the existing roof decking installing underlayment and ice dam protection laying the first row laying shingles in the field flashing ridge shingles and vents and more.