If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
How to tie roll roofing into a shingle roof.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
Armourvalley or other materials like epdm pvc or tpo covering.
Instead the roof must be done with a modified bituminous membrane e g.
It appears to be flat but it needs a slope to allow the water to drain from the roof.
Place the first layer of rolled roofing on the roof.
Even though the higher roof was installed first the end result.
No one of this affirmat.
The flashing should double lap the roll roofing.
Roofing nails to the existing structural sheathing.
At this point your will have a starter row at the bottom and a row of shingles along each side.
Mark this point of the.
A flat roof isn t actually flat.
The most trusted miami roofing contractor professionally describes the installation of thi.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
Run a line of shingles from the top butt it against the bottom row of shingles on your home and lay them along each edge with the tabs facing inward.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
It has a slope of 2 3.
Push the rolled roofing down into the wet cement to secure it to the roof.
In this video i show you how i do the valleys on a shingle roof.
Many roofers cut the shingles across because they say it s safer.
For slopes less than 9 5 we cannot install roof shingles.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
This video shows the transition of a shingle roof to a metal roof.
The first layer should cover the roof as far as the chalk line.
As with applying shingles to any roof invert the bottom row of shingles for your starter row.