Below the top of the foundation but the lower the vinyl siding is installed the better.
How to install vinyl siding on a peak.
Some manufacturers of vinyl siding do not recommend the use of drop in backers with certain vinyl siding configurations.
When cutting vinyl siding it s usually to go into a corner.
Next lock a scrap piece of siding into the panel below butting against the window.
You need to leave at least 1 4.
Next measure and cut the siding to fit the measurements of your soffit and push each panel into the j channel.
Pop a level chalk line for the starter strip an inch or two above the bottom of the siding.
Mark the height needed allowing 1 4 in.
It protects the sheathing from rain snow and pests.
Clearance on each window side.
Use the wider starter strip.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.
As an alternative installation of specific types of drop in contoured foam underlayments for various styles of vinyl siding are available.
Clearance below the sill.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
If you don t cut your siding short when it expands in the summer it s going to buckle.
Begin by installing the first row of siding on both sides of the deck.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
To provide a common reference point measure up 8 in.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.
A great tutorial on how to cut install vinyl siding using just the side track saw table ordinary stanley knife shows cuts around top bottom of a windo.
From the top of this row and stretch a string line across the deck.